MARSH LN SB over FARMERS BRANCH CREEK

0.8 MILES NORTH IH 635 · County 113, Texas · Built 2019 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570G00790023
Year Built
2019
Length
52.4 m (171.9 ft)
Max Span
19.8 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.