ROBINSON RD over TRAILWOOD BRANCH
0.3 MI S OF POLO RD · County 113, Texas · Built 2013 · 4 Lanes · 5,482 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.654978, -97.015014
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 13 years old.
Nearby Bridges
POLO RD over FISH CREEK TRIBUTARY
Built 1988
PRAIRIE LN over TRAILWOOD BRANCH
Built 2013
S CARRIER PKWY over TRIB MOUNTAIN CREEK
Built 2005
MATTHEW RD over TRAILWOOD BRANCH
Built 1978
E POLO RD over TRIB MOUNTAIN CREEK
Built 2003
BARDIN RD EB over FISH CREEK
Built 2006
CAMP WISDOM ROAD over JOE POOL LEVEE DRAIN
Built 2022
BARDIN RD WB over FISH CREEK
Built 2006
LAKE RIDGE PKWY NB over FISH CREEK
Built 2013
LAKE RIDGE PKWY SB over FISH CREEK
Built 2013
Bridge Details
- Structure #
- 180570F12508004
- Year Built
- 2013
- Length
- 11.6 m (38.1 ft)
- Max Span
- 2.7 m
- Width
- 30.2 m (99.1 ft)
- Lanes
- 4
- Daily Traffic
- 5,482
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.