YALE BOULEVARD over HUFFHINES CREEK

0.25 MI N OF BELT LINE RD · County 113, Texas · Built 1970 · 2 Lanes · 3,606 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180570E02735003
Year Built
1970
Length
19.8 m (65 ft)
Max Span
3 m
Width
22 m (72.2 ft)
Lanes
2
Daily Traffic
3,606
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$6,000
Total Project Cost
$8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.