E VALLEY RANCH NB over DRAINAGE CHANNEL
0.6 MI SE OF MACARTHUR · County 113, Texas · Built 1987 · 2 Lanes · 3,475 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.934111, -96.943517
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 39 years old.
Nearby Bridges
E VALLEY RANCH SB over DRAINAGE CHANNEL
Built 1987
SADDLEHORN DR over DRAINAGE CHANNEL
Built 1986
MACARTHUR BLVD SB over DRAINAGE CANAL
Built 1986
MACARTHUR BLVD NB over DRAINAGE CANAL
Built 1986
E VALLEY RANCH PKY over SUNDANCE CANAL
Built 1995
RANCH TRAIL RD over DRAINAGE CHANNEL
Built 1985
MACARTHUR BLVD NB over DRAINAGE CHANNEL
Built 1987
AVE OF CHAMPIONS over DRAINAGE CHANNEL
Built 1985
MACARTHUR BLVD SB over DRAINAGE CHANNEL
Built 1987
PGBT SB over (Future) Valwood Pkwy
Built 2006
Bridge Details
- Structure #
- 180570D09225002
- Year Built
- 1987
- Length
- 24.7 m (81 ft)
- Max Span
- 24.4 m
- Width
- 10.3 m (33.8 ft)
- Lanes
- 2
- Daily Traffic
- 3,475
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.