ROYAL LN over ELM FORK TRINITY RIVER
0.6 MI W OF LUNA RD · County 113, Texas · Built 1991 · 4 Lanes · 18,230 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.895608, -96.928925
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 35 years old.
Nearby Bridges
ROYAL LN over EQUESTRIAN CENTER CANAL
Built 1991
CAMINO LAGO over EQUESTRIAN CENTER CANAL
Built 2006
Plaza Via over La De Claire
Built 2005
RIVERSIDE DR NB over HACKBERRY CREEK
Built 2000
RIVERSIDE DR SB over HACKBERY CREEK
Built 1985
Deseo over Lago De Claire
Built 2005
RIVERSIDE DR SB over HACKBERRY CREEK RELIEF
Built 1985
RIVERSIDE DR NB over HACKBERRY CREEK RELIEF
Built 2000
RIVERSIDE DR NB over HACKBERRY CREEK
Built 2000
RIVERSIDE DR SB over HACKBERRY CREEK
Built 1985
Bridge Details
- Structure #
- 180570D07160004
- Year Built
- 1991
- Length
- 335.3 m (1100.1 ft)
- Max Span
- 30.5 m
- Width
- 26.9 m (88.3 ft)
- Lanes
- 4
- Daily Traffic
- 18,230
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $110,000
- Total Project Cost
- $138,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.