BELT LINE RD NB over BEAR CREEK

0.2 MI N OF OAKDALE RD · County 113, Texas · Built 2007 · 3 Lanes · 13,319 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180570D00570009
Year Built
2007
Length
137.2 m (450.1 ft)
Max Span
22.9 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
13,319
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.