E CARTWRIGHT RD over DRAINAGE DITCH
0.15 MI W OF PIONEER · County 113, Texas · Built 1991 · 7 Lanes · 19,848 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.744931, -96.5862
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 35 years old.
Nearby Bridges
E CARTWRIGHT RD over S MESQUITE CREEK TRIB
Built 1991
PIONEER RD over RELF to S MESQUITE CREEK
Built 2013
Briar Crossing over Draw
Built 1999
WILKINSON RD over S MESQUITE CREEK
Built 2013
BELT LINE RD over S MESQUITE CREEK TRIB
Built 1970
BELT LINE RD over SOUTH MESQUITE CREEK
Built 2004
SH 352 WB over South Mesquite Creek
Built 1969
PIONEER RD over SOUTH MESQUITE CREEK
Built 2013
BELT LINE RD over S MESQUITE CREEK TRIB
Built 2004
E Cartwright Rd over S Mesquite Creek Trib
Built 2004
Bridge Details
- Structure #
- 180570C00430017
- Year Built
- 1991
- Length
- 7.9 m (25.9 ft)
- Max Span
- 2.1 m
- Width
- 44.8 m (147 ft)
- Lanes
- 7
- Daily Traffic
- 19,848
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $42,000
- Total Project Cost
- $53,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.