ROCK ISLAND RD over BEAR CREEK
1.2 MI W OF BELT LINE RD · County 113, Texas · Built 1986 · 2 Lanes · 3,936 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
32.815822, -97.014433
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 40 years old.
Nearby Bridges
SH 161 NB ML over ROCK ISLAND RD BEAR CR
Built 2009
SH 161 NB OFF-RAMP over SUMP & DRAIN
Built 2011
SH 161 SB ON-RAMP over SUMP & DRAIN
Built 2011
Conflans Rd over Draw
Built 2007
SH 161 SB ML over ROCK ISLAND RD BEAR CR
Built 2009
Mahmoud Egal Dr. over Draw
Built 2019
W SHADY GROVE RD over BEAR CREEK
Built 1990
Shemsa Way over Storm Drain
Built 2018
SH 161 NBML over TRINITY BLVD SHADY GR
Built 2009
PGBT SBML over TRINITY BLVD SHADY GR
Built 2009
Bridge Details
- Structure #
- 180570AA7580003
- Year Built
- 1986
- Length
- 48.8 m (160.1 ft)
- Max Span
- 24.4 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,936
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,000
- Total Project Cost
- $11,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.