WHITEHURST DR over JACKSON BRANCH

0.65 MI E OF ABRAMS RD · County 113, Texas · Built 1978 · 4 Lanes · 5,153 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1805709W4170001
Year Built
1978
Length
27.7 m (90.9 ft)
Max Span
9.1 m
Width
17.4 m (57.1 ft)
Lanes
4
Daily Traffic
5,153
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$8,000
Total Project Cost
$10,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.