SPRING VALLEY EB over WHITE ROCK CREEK
0.5 MI E OF PRESTON · County 113, Texas · Built 1986 · 3 Lanes · 8,610 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.939728, -96.795564
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 40 years old.
Nearby Bridges
SPRING VALLEY WB over WHITE ROCK CRK REL
Built 1986
SPRING VALLEY WB over WHITE ROCK CREEK
Built 1979
MEADOWCREEK DR over ARAPAHO BRANCH
Built 1963
ALPHA ROAD over WHITE ROCK CREEK
Built 1978
SH 289 (PrestonRd) over White Rock Creek
Built 1978
PRESTON OAKS ROAD over OTO BRANCH
Built 1978
ALEXIS DR WB over KIOWA BRANCH
Built 1951
Alexis Drive EB over Kiowa Branch
Built 1985
BELT LINE RD over KIOWA BRANCH
Built 1950
BELT LINE RD over ARAPAHO BRANCH
Built 1967
Bridge Details
- Structure #
- 1805709S6080015
- Year Built
- 1986
- Length
- 177.4 m (582 ft)
- Max Span
- 24.4 m
- Width
- 13.1 m (43 ft)
- Lanes
- 3
- Daily Traffic
- 8,610
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $38,000
- Total Project Cost
- $48,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.