PLANO RD over DRAINAGE DITCH

350 FT S OF MILLER RD · County 113, Texas · Built 1992 · 6 Lanes · 17,362 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
1805709P5310001
Year Built
1992
Length
14 m (45.9 ft)
Max Span
2.1 m
Width
29.4 m (96.5 ft)
Lanes
6
Daily Traffic
17,362
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$6,000
Total Project Cost
$8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.