FOREST LN WB over BUFFALO CREEK

0.30 MI E OF HILLCREST RD · County 113, Texas · Built 1972 · 3 Lanes · 12,936 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
1805709F6680016
Year Built
1972
Length
21.9 m (71.9 ft)
Max Span
8.5 m
Width
13.3 m (43.6 ft)
Lanes
3
Daily Traffic
12,936
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.