Holford Rd SB over PGBT

0.6Mi SE of W Campbell Rd · County 113, Texas · Built 2000 · 4 Lanes · 1,605 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570296406603
Year Built
2000
Length
72.2 m (236.9 ft)
Max Span
36 m
Width
21.1 m (69.2 ft)
Lanes
4
Daily Traffic
1,605
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.