PGBT NB over Sandy Lake Rd

1.0 Mi S of IH 35E · County 113, Texas · Built 2006 · 3 Lanes · 54,936 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570296402592
Year Built
2006
Length
69.8 m (229 ft)
Max Span
38.4 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
54,936
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.