PGBT SB over SPUR 303 / PIONEER PKWY

2.35 MI N OF IH 20 · County 113, Texas · Built 2012 · 3 Lanes · 8,818 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570296401532
Year Built
2012
Length
74.1 m (243.1 ft)
Max Span
38.1 m
Width
25 m (82 ft)
Lanes
3
Daily Traffic
8,818
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.