PGBT NBML over CARRIER PKY & JOHNSON CR

0.66 MI N OF IH 30 · County 113, Texas · Built 2009 · 4 Lanes · 35,540 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570296401071
Year Built
2009
Length
582.2 m (1910.1 ft)
Max Span
64 m
Width
29 m (95.1 ft)
Lanes
4
Daily Traffic
35,540
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.