IH 635 EBFR over RAWHIDE CREEK

1.1 MI W OF IH 35E · County 113, Texas · Built 1977 · 2 Lanes · 2,424 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570237407360
Year Built
1977
Length
97.5 m (319.9 ft)
Max Span
24.4 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
2,424
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.