IH 635 EB over DART RR & COUNTY LINE RD
8.3 MI W OF IH 35E · County 113, Texas · Built 1979 · 4 Lanes · 47,751 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.9471, -97.027986
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 47 years old.
Nearby Bridges
IH 635 WB over DART RR & COUNTY LINE RD
Built 1979
IH 635 WB over ROYAL LN
Built 1979
IH 635 EB over ROYAL LN
Built 1979
Technology Rd. over Drain
Built 2019
ROYAL LANE over DRAINAGE DITCH
Built 1998
IH 635 WB CONN over SH 121
Built 2020
Ramp A - IH 635 over COTTONWOOD CREEK
Built 1981
BASS PRO RD over COTTONWOOD BRANCH
Built 2010
IH635WB to SH121NB over COTTONWOOD BR & 121 EXIT
Built 2020
SH121NB TO IH635EB over SH 114 WB to INTL PKY NB
Built 2013
Bridge Details
- Structure #
- 180570237407343
- Year Built
- 1979
- Reconstructed
- 2020
- Length
- 144.2 m (473.1 ft)
- Max Span
- 25.9 m
- Width
- 24.8 m (81.4 ft)
- Lanes
- 4
- Daily Traffic
- 47,751
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.