IH 20 EB over NEWTON CREEK

4.4 MI E OF SH 342 · County 113, Texas · Built 1971 · 4 Lanes · 70,542 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570237403140
Year Built
1971
Length
65.5 m (214.9 ft)
Max Span
21.6 m
Width
22.3 m (73.2 ft)
Lanes
4
Daily Traffic
70,542
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.