IH 635 CONN D over RYLIE CREST RD
0.7 MI N OF US 175 · County 113, Texas · Built 1987 · 1 Lanes · 12,280 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.699475, -96.627097
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 39 years old.
Nearby Bridges
IH 20 WB over IH 635 CONN C
Built 1987
IH 635 SB over RYLIE CREST RD
Built 1969
IH 635 NB over IH 20 & IH 635 CONN
Built 1987
IH 20 EB over IH 635 CONN C
Built 1987
US 175 EB CONN D over RYLIE CREST & KLEBERG RD
Built 1987
IH 20 ML over DRAW
Built 1988
RYLIE-CREST DR over HICKORY CREEK
Built 1994
KLEBERG RD(CONN F) over IH 20
Built 1987
IH 635 RAMP C over HICKORY CREEK
Built 1987
IH 20 EB over HICKORY CREEK
Built 1987
Bridge Details
- Structure #
- 180570237402418
- Year Built
- 1987
- Length
- 160 m (524.9 ft)
- Max Span
- 37.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 12,280
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $26,000
- Total Project Cost
- $33,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.