IH 635 over Draw
3.7 Mi N of Elam Rd · County 113, Texas · Built 1969 · 10 Lanes · 182,015 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 4 | Poor |
Location
32.771942, -96.623339
This bridge is in worse condition than 99% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 57 years old.
Nearby Bridges
IH 635 NB over UP RR
Built 1971
IH 635 SB over UP RR
Built 1971
IH 635 NB over SH 352 WB
Built 1969
IH 635 SB over SH 352 WB
Built 1969
IH 635 NB over S MESQUITE CREEK
Built 1971
IH 635 SB over S MESQUITE CREEK
Built 1971
IH 635 SB over SH 352 EB(Military Pkwy)
Built 1969
IH 635 NB over SH 352 EB(Military Pkwy)
Built 1969
N. Peachtree Rd. over S MESQUITE CREEK TRIB
Built 1984
MILITARY PKY EB over S MESQUITE CREEK
Built 2006
Bridge Details
- Structure #
- 180570237402080
- Year Built
- 1969
- Length
- 8.2 m (26.9 ft)
- Max Span
- 2.4 m
- Lanes
- 10
- Daily Traffic
- 182,015
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.