IH 635 WBML over WEBB CHAPEL RD

1.48 E of IH-35E · County 113, Texas · Built 2013 · 6 Lanes · 87,144 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180570237401592
Year Built
2013
Length
577.3 m (1894 ft)
Max Span
38.4 m
Width
26.8 m (87.9 ft)
Lanes
6
Daily Traffic
87,144
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.