IH 635 WB over IH 635 TXE WB Exit Ramp

1.5 Mil W of US75 · County 113, Texas · Built 2013 · 5 Lanes · 116,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570237401581
Year Built
2013
Length
182.9 m (600.1 ft)
Max Span
30.5 m
Width
26.4 m (86.6 ft)
Lanes
5
Daily Traffic
116,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.