IH635 EBFR over WHITE ROCK CREEK

1 MI W OF US 75 · County 113, Texas · Built 2013 · 1 Lanes · 221,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
180570237401542
Year Built
2013
Length
42.7 m (140.1 ft)
Max Span
18.3 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
221,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.