IH 30 Managed Lns over IH 30
1.15 MI E of PGBT · County 113, Texas · Built 2016 · 1 Lanes · 2,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.759861, -96.974236
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 10 years old.
Nearby Bridges
IH 30 Managed Ln over IH 30
Built 2016
IH 30 over DRAW
Built 2001
PERFORMANCE PL RD over DRAINAGE DITCH
Built 2004
IH 30 over MACARTHUR BLVD
Built 1994
IH 30 over RR SPUR
Built 1994
IH 30 WB OFF RAMP over RR SPUR
Built 1994
IH 30 EBFR over RR SPUR
Built 2003
Palace Parkway over Gopher Creek
Built 2019
LONE STAR PKWY EB over DRAINAGE CHANNEL
Built 1990
POLLOCK PLACE RD over SUMP LAKE
Built 2004
Bridge Details
- Structure #
- 180570106804573
- Year Built
- 2016
- Length
- 324.9 m (1065.9 ft)
- Max Span
- 41.5 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 2,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.