HAMPTON RD over IH 30

3.5 MI E OF LOOP 12 · County 113, Texas · Built 1957 · 7 Lanes · 37,887 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570106804109
Year Built
1957
Length
81.4 m (267.1 ft)
Max Span
58.5 m
Width
28.7 m (94.2 ft)
Lanes
7
Daily Traffic
37,887
Material
Steel
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$43,000
Total Project Cost
$54,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.