LP 12 Conn to IH30 over LP 12
1.1 Mi N of W Davis St · County 113, Texas · Built 1980 · 2 Lanes · 6,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.764486, -96.914956
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 46 years old.
Nearby Bridges
Anderson Ave over LP 12
Built 1980
IH 30 EBML over LOOP 12 & UPRR
Built 2010
IH 30 WBML over LOOP 12 & UPRR
Built 2010
LOOP 12 CONNECTOR over IH 30
Built 2005
BERNAL DRIVE over DRAINAGE CHANNEL
Built 1940
IH 30 over MOUNTAIN CREEK
Built 2003
IH 30 EB over CHALK HILL RD
Built 2006
IH 30 WB over CHALK HILL RD
Built 2006
IH 30 over DRAINAGE DITCH
Built 2000
Hale St over Chalk Hill Creek
Built 1974
Bridge Details
- Structure #
- 180570058102083
- Year Built
- 1980
- Length
- 103.3 m (338.9 ft)
- Max Span
- 29.9 m
- Width
- 19.6 m (64.3 ft)
- Lanes
- 2
- Daily Traffic
- 6,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.