LP 12 over DRAIN

1.25 MI S OF SH 180 · County 113, Texas · Built 1975 · 14 Lanes · 119,180 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180570058102065
Year Built
1975
Length
10.4 m (34.1 ft)
Max Span
2.4 m
Lanes
14
Daily Traffic
119,180
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.