LP 12 SB over Five Mile Creek

0.35 Mi SE of SP 303 · County 113, Texas · Built 1948 · 3 Lanes · 12,383 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570058102015
Year Built
1948
Reconstructed
1968
Length
39.6 m (129.9 ft)
Max Span
9.1 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
12,383
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,000
Total Project Cost
$18,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.