Mockingbird/Peavy over Loop 12

1.6 MI W of SH 278 · County 113, Texas · Built 2021 · 4 Lanes · 10,450 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
180570058101404
Year Built
2021
Length
33.5 m (109.9 ft)
Max Span
33.5 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
10,450
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.