LP 12 NB over UP RR

1.6 Mi S of IH 30 · County 113, Texas · Built 1997 · 3 Lanes · 20,805 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180570058101005
Year Built
1997
Length
219.2 m (719.2 ft)
Max Span
23.5 m
Width
13.1 m (43 ft)
Lanes
3
Daily Traffic
20,805
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$50,000
Total Project Cost
$63,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.