LP 12 NB/SH 183 WB over LP 12; SH 183

SH 183/LP 12 INTERCHANGE · County 113, Texas · Built 2024 · 2 Lanes · 32,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
180570051802007
Year Built
2024
Length
1114 m (3654.9 ft)
Max Span
50.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
32,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.