E. 8th St over IH 35E
0.2 MI N of E 10th Street · County 113, Texas · Built 2019 · 8 Lanes · 9,660 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.751158, -96.809797
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
IH 35E SB over 10TH ST.
Built 2021
IH 35E NBML over 10TH STREET
Built 2024
IH 35E NB ENT RAMP over IH 35E NB EXIT 8TH
Built 2024
EWING AVENUE over IH 35E
Built 2021
S MOORE ST over CEDAR CREEK
Built 1955
IH 35 E NB over TRINITY RIVER
Built 2017
IH 35E SB over Colorado Blvd
Built 2017
IH 35E NBFR RAMP over ROW @ COLORADO BLVD
Built 2017
IH 35E NB ENT RAMP over COLORADO BLVD
Built 2017
MARSALIS AVE over IH 35E
Built 2021
Bridge Details
- Structure #
- 180570044202430
- Year Built
- 2019
- Length
- 74.7 m (245.1 ft)
- Max Span
- 41.9 m
- Width
- 52.4 m (171.9 ft)
- Lanes
- 8
- Daily Traffic
- 9,660
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.