SH 352 over N Mesquite Creek
1.15 Mi S of US 80 · County 113, Texas · Built 1998 · 4 Lanes · 13,193 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.771319, -96.57395
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 28 years old.
Nearby Bridges
SCYENE RD over NORTH MESQUITE CREEK
Built 1948
SH 352 over UP RR / Scyene Rd
Built 1999
EAST GLEN EB over NORTH MESQUITE CREEK
Built 1991
EAST GLEN WB over NORTH MESQUITE CREEK
Built 1991
US 80 EB over SH 352
Built 2012
US 80 WB over SH 352
Built 2012
US 80 over LONG CREEK
Built 2011
LONG CREEK RD over LONG CREEK
Built 1964
COLLINS RD over LONG CREEK
Built 2021
E TRIPP RD over LONG CREEK BRANCH
Built 2022
Bridge Details
- Structure #
- 180570043001011
- Year Built
- 1998
- Length
- 62.2 m (204.1 ft)
- Max Span
- 12.5 m
- Width
- 20.1 m (65.9 ft)
- Lanes
- 4
- Daily Traffic
- 13,193
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $206,000
- Total Project Cost
- $258,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.