LP 12 over STRAIGHT BRANCH

3.1MI W OF US75 · County 113, Texas · Built 1930 · 6 Lanes · 39,382 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180570035305030
Year Built
1930
Reconstructed
1970
Length
8.5 m (27.9 ft)
Max Span
3.7 m
Lanes
6
Daily Traffic
39,382
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.