SH 114 EBFR over S Fork Hackberry Creek

0.40 MI SE OF SH 161 · County 113, Texas · Built 1986 · 3 Lanes · 4,771 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180570035304163
Year Built
1986
Length
12.8 m (42 ft)
Max Span
3 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
4,771
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.