LP 12 over Drainage Ditch

0.10 Mi SE of IH 35E · County 113, Texas · Built 1961 · 8 Lanes · 23,898 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570035304046
Year Built
1961
Reconstructed
2005
Length
43.9 m (144 ft)
Max Span
6.4 m
Width
33.2 m (108.9 ft)
Lanes
8
Daily Traffic
23,898
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$25,000
Total Project Cost
$31,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.