LP 12 over Drainage Ditch
0.10 Mi SE of IH 35E · County 113, Texas · Built 1961 · 8 Lanes · 23,898 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.861936, -96.892178
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 65 years old.
Nearby Bridges
IH35E IH635 N E DC over JOES CRK W NW HWY ETC
Built 2014
IH 35E NB over Drainage Ditch
Built 1961
IH 35E NB over Loop 12 NW Highway
Built 1961
IH 35E SB over Drainage Ditch
Built 1961
IH 35E SB over Loop 12 and W NW Highway
Built 1961
IH 35E SB Ent Ramp over Daniels Creek
Built 2013
LOMBARDY LANE over DANIELS CREEK
Built 1963
IH 35E NB over Lombardy Ln
Built 1962
IH 35E SB over Lombardy Ln
Built 1962
SHADY TRAIL over DRAINAGE DITCH
Built 1970
Bridge Details
- Structure #
- 180570035304046
- Year Built
- 1961
- Reconstructed
- 2005
- Length
- 43.9 m (144 ft)
- Max Span
- 6.4 m
- Width
- 33.2 m (108.9 ft)
- Lanes
- 8
- Daily Traffic
- 23,898
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $25,000
- Total Project Cost
- $31,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.