SP 348 over Daniels Creek

0.55 Mi NW of IH 35E · County 113, Texas · Built 1929 · 6 Lanes · 28,858 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
180570035304026
Year Built
1929
Reconstructed
1975
Length
19.2 m (63 ft)
Max Span
6.1 m
Width
32.4 m (106.3 ft)
Lanes
6
Daily Traffic
28,858
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.