US 67 NB FR over MAUK BRANCH

1.50 MI SW OF IH 20 · County 113, Texas · Built 1975 · 3 Lanes · 11,606 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180570026102055
Year Built
1975
Reconstructed
2020
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
14.4 m (47.2 ft)
Lanes
3
Daily Traffic
11,606
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.