US 175 WB over DRAW
0.15 MI W OF SM WRIGHT · County 113, Texas · Built 2020 · 2 Lanes · 36,295 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.744853, -96.762039
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
IH 45 SB Conn over IH 45
Built 2020
US 175 WB over S Lamar St & SM Wright
Built 2020
US 175 EB over Lamar St & SM Wright
Built 2019
IH 45 NB to Lamar over UP RR
Built 2020
IH 45 NB over TRINITY RIVER UPRR etc
Built 1973
IH 45 SB over TRINITY RIVER UPRR ETC
Built 1973
US175/IH45NB CON A over Lamar St
Built 2020
IH 45 SB Off Ramp over Trinity River Branch
Built 1972
IH 45 NB On Ramp over Trinity River Branch
Built 1972
US 175 over BEXAR ST
Built 2020
Bridge Details
- Structure #
- 180570019702428
- Year Built
- 2020
- Length
- 490.4 m (1608.9 ft)
- Max Span
- 33.5 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 36,295
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.