US 175 EB over E FORK TRINITY RIV TRIB

7.35 MI SE OF IH 20 · County 113, Texas · Built 1948 · 2 Lanes · 25,070 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570019702092
Year Built
1948
Reconstructed
1971
Length
30.5 m (100.1 ft)
Max Span
7.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
25,070
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.