IH 35E SB over Hi Line Dr./Victory Ave.

0.8 Mi. N of Spur 366 · County 113, Texas · Built 1959 · 5 Lanes · 121,781 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570019603245
Year Built
1959
Reconstructed
1983
Length
203 m (666 ft)
Max Span
21.9 m
Width
24.7 m (81 ft)
Lanes
5
Daily Traffic
121,781
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$131,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.