IH 35E over Oak Lawn Ave & Turtle Ck
2.0 Mi N of IH 30 · County 113, Texas · Built 1959 · 10 Lanes · 194,462 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
32.798386, -96.818758
This bridge is in worse condition than 99% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 67 years old.
Nearby Bridges
IH 35E SB FR over Turtle Creek
Built 1959
OAK LAWN AVE SB over TURTLE CREEK
Built 1959
IH 35E NBFR over Turtle Creek
Built 1959
OAK LAWN AVE NB over TURTLE CREEK
Built 1959
HARRY HINES BLVD over OAK LAWN AVE
Built 1960
DNT & HARRY HINES over TURTLE CREEK
Built 1940
IH 35E ML & FR over Cedar Springs Branch
Built 1957
DALLAS N TLWY SB over HARRY HINES BLVD NB
Built 1966
IH 35E NB Conn over DART & DNT
Built 1967
DALLAS N TOLLWAY over OAK LAWN AVE
Built 2007
Bridge Details
- Structure #
- 180570019603101
- Year Built
- 1959
- Reconstructed
- 1983
- Length
- 406.6 m (1334 ft)
- Max Span
- 17.7 m
- Width
- 49.4 m (162.1 ft)
- Lanes
- 10
- Daily Traffic
- 194,462
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $419,000
- Total Project Cost
- $524,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.