IH 35E SBML over Furneaux Creek

5.5 Mi N of IH 635 · County 113, Texas · Built 2003 · 5 Lanes · 74,762 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570019603018
Year Built
2003
Length
75 m (246.1 ft)
Max Span
25 m
Width
31.4 m (103 ft)
Lanes
5
Daily Traffic
74,762
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.