SH 183 EB over ElmFkTrinityRv/MKTRRSpur

1.1 Mi SE of LP 12 · County 113, Texas · Built 2018 · 8 Lanes · 135,330 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570009407327
Year Built
2018
Length
975.4 m (3200.1 ft)
Max Span
45.7 m
Width
35.7 m (117.1 ft)
Lanes
8
Daily Traffic
135,330
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.