SH 183 EB over OConnor Road

2.10 Mi W of Lp 12 · County 113, Texas · Built 2017 · 6 Lanes · 130,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570009403334
Year Built
2017
Length
97.2 m (318.9 ft)
Max Span
34.4 m
Width
44.5 m (146 ft)
Lanes
6
Daily Traffic
130,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.