SH 183 over Draw

2.8 Mi W of LP 12 · County 113, Texas · Built 2018 · 16 Lanes · 151,351 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180570009403020
Year Built
2018
Length
10.7 m (35.1 ft)
Max Span
2.4 m
Lanes
16
Daily Traffic
151,351
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.