US 75 SBFR over US 75 SB ON-Ramp

US75 SBML N OF LEMMON AVE · County 113, Texas · Built 2000 · 1 Lanes · 13,726 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570004707726
Year Built
2000
Length
58.6 m (192.3 ft)
Max Span
29.3 m
Width
3.9 m (12.8 ft)
Lanes
1
Daily Traffic
13,726
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.