GALATYN CROSSING over US 75

0.10 MILES S OF COLLIN CL · County 113, Texas · Built 2004 · 4 Lanes · 10,393 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570004707417
Year Built
2004
Length
36.6 m (120.1 ft)
Max Span
36.6 m
Width
15.1 m (49.5 ft)
Lanes
4
Daily Traffic
10,393
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,000
Total Project Cost
$15,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.