MOCKINGBIRD LN EB over US 75

4.40 MI N OF IH 30 · County 113, Texas · Built 1998 · 5 Lanes · 8,457 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570004707330
Year Built
1998
Length
55.5 m (182.1 ft)
Max Span
27.7 m
Width
34.8 m (114.2 ft)
Lanes
5
Daily Traffic
8,457
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.